OP-310DAQ,OP-310DA

● Forward & Reversible knob.
● Motor set is in alloy steel material.
● 2 step push start trigger
● Anvil have 2 different type Q & F
● The front cap & the body are fixed by screws, suitable for long working time,and not easy loose the front cap.

Application:
Apply to heavy-productive assembly line of car and motor.
Share to:

SPECIFICATION(air pressure at 90 psi、6.2bar、6.3kg/cm2)

MODEL

Screw Size Capacity

Working
Torque

MAX.
Torque

Free

Air
Consumption

Overall
Length

Air
Inlet

Net
Weight

Sound
Level

Bits
Type

Speed

mm

Nm

ft-lb

Nm

ft-lb

rpm

l/min

cfm

mm

inch

P.T

kg

lb

dB(A)

Type

OP-310DA

8

68

50

300

221

8000

254

9

200

7.87

1/4

1.2

2.65

96

Q

OP-310DAQ

8

68

50

300

221

8000

254

9

200

7.87

1/4

1.2

2.65

96

F

Packing List :
Carton : 20 Pcs / N.W : 23.5 KGS / G.W. : 28.3 KGS / CUFT : 1.1"